Health checked, evidence attached.
DCMA 14-point with the activities responsible for each fail — drill-down ready for the planner’s narrative.
Sign Up FreeNo credit card required
Native P6 / MS Project parsing
Reads .xer (P6) and .csv (MS Project) directly. Activity composition, calendars, relationships, lags, constraints, baseline, resources — all parsed.
Real DCMA thresholds
Defaults match the DCMA 14-point standard (5%, 0%, 90%, 44d, 0.95). Every threshold is editable; Reset to DCMA Defaults restores them.
N/A handling
Resources, Missed Tasks, CPLI and BEI are marked N/A when the programme has no resources or no baseline. Score computed only on applicable checks.
Drill-down per check
Each fail expands to show the offending activities (up to 50 per check) with the issue and the metric — predecessor missing, lag value, constraint type, slip days.
Critical Path Test
Slips a critical activity 20 days and reports actual days propagated — pass when project completion moves the full 20 days.
Multi-programme picker
If the project has more than one programme uploaded, choose which to assess. Last assessment is timestamped in the header.