Schedule Delay Analysis

Time-slice window analysis with longest-path tracing, root-cause walk, event correlation, and Sub-Clause 8.4 / 8.5 entitlement attribution.

controlsiq.com/dashboard/schedule/delay-analysis

From slip to entitlement — defensible, every step.

Per-window CPM, longest-path tracing, root-cause walk, event correlation, notice validation. Entitlement attributed under Sub-Clause 8.4 / 8.5.

Sign Up Free

No credit card required

Time-slice windows
Two programme snapshots per window — start and finish — analysed independently. Forecast at window finish, delay quantum, critical-path-changed flag, top delayed activities.
Longest-path tracing
True longest path — not just zero-float. Both start-of-window and finish-of-window paths shown side-by-side, with new-on-path and dropped-from-path activities highlighted.
Root-cause walk
Walks back from the delay driver through predecessors with a propagation chain — slip days, float consumed, effective contribution. Cause-shift detection when the underlying obligation is fulfilled but the dependent stalls.
Event correlation
Linked events from Notice Tracker get one of three outcomes: Correlated, Weak link, or Not related. Affected activity is user-selectable; correlation re-runs on change.
Notice time-bar
28-day awareness window from Sub-Clause 20.1 / 20.2.1. Late notice excludes an event from EOT even when correlation is strong — surfaced in the engine's reasoning string.
Attribution feasibility
Each linked event can attribute at most as many days as fall between its date and the window's finish — anything earlier needs another event. When the linked events can't reach back far enough, the engine flags the gap and routes the unsubstantiated days to the Contractor bucket.