Five tools, one connected layer

Every tool reads your contract, your programme and your project data — and feeds into the same intelligence layer underneath. The notice you draft today references the entitlement Claims Digger surfaced; the delay analysis correlates with the events Notice Tracker logged.

Contract
Claims Digger

Identify entitlements to time, cost or both — under your actual contract.

  • Full FIDIC General Conditions analysis (Red, Yellow, Silver — 1999 / 2017)
  • Reads your Particular Conditions in every answer
  • Cites Sub-Clause references you can verify
  • Conversational Q&A — ask any contractual question
See Claims Digger demo →
Contract
Notice Tracker

Every required notice for a logged delay event — generated, deadlined, drafted.

  • Programme-aware deadlines computed against your actual programme
  • Time-bar compliance tracked per Sub-Clause 20.1 / 20.2
  • One-click drafted correspondence — PC-aware, third-person, .docx download
  • Status workflow: pending → served → undo
See Notice Tracker demo →
Schedule
Schedule Health

DCMA 14-point assessment with adjustable thresholds and drill-down.

  • Native P6 .xer and CSV (MS Project) parsing
  • Real defaults: 5 % / 0 % / ≥ 90 % FS / 44d / ≥ 0.95
  • Drill-down per check shows the activities responsible
  • Critical Path Test reports actual slip-days propagated
See Schedule Health demo →
Schedule
Schedule Comparison

Diagnose what changed between two programmes — every dimension.

  • Per-activity variance on plan finish, duration, float, effort and cost
  • Predecessor diff — added, removed, type / lag changes
  • Excel export with summary + change log sheets
  • Compare any two programmes from a project, not just baseline-to-current
See Schedule Comparison demo →
Schedule
Delay Analysis

Time-slice windows, longest-path tracing, FIDIC entitlement attribution.

  • Per-window CPM with longest-path tracing and root-cause walk
  • Event correlation tied to Notice Tracker — strong / weak / not related
  • Notice time-bar validation under Sub-Clause 20.1 / 20.2
  • Sub-Clause 8.4 / 8.5 attribution between EOT entitlement and Contractor's risk
See Delay Analysis demo →

More tools coming soon

Cost intelligence, risk register and field-progress tools are next on the roadmap — built for the same practitioners and connecting into the same project layer.