Identify entitlements to time, cost or both — under your actual contract.
- ✓Full FIDIC General Conditions analysis (Red, Yellow, Silver — 1999 / 2017)
- ✓Reads your Particular Conditions in every answer
- ✓Cites Sub-Clause references you can verify
- ✓Conversational Q&A — ask any contractual question
See Claims Digger demo →Every required notice for a logged delay event — generated, deadlined, drafted.
- ✓Programme-aware deadlines computed against your actual programme
- ✓Time-bar compliance tracked per Sub-Clause 20.1 / 20.2
- ✓One-click drafted correspondence — PC-aware, third-person, .docx download
- ✓Status workflow: pending → served → undo
See Notice Tracker demo →⇄
Contract
Particular Conditions Analysis
A clause-by-clause register of how your Particular Conditions amend the General Conditions.
- ✓Sub-clause · amendment · impact — every change in document order
- ✓Impact tagged Time, Cost, Time & Cost, or contract structure
- ✓Handles full Special Conditions to Clause 21 — analysed in sections
- ✓Excel export for your claims file or contract review
See Particular Conditions Analysis demo →▤
Schedule
Programme + Key Dates
Drop your P6 or MS Project programme — milestones lift into the Key Dates Register.
- ✓Native Primavera P6 .xer parsing (TASK, WBS, CALENDAR, predecessors, baseline, resources)
- ✓MS Project .csv import — column-mapped, no template
- ✓Milestone auto-detection on TT_Mile / TT_FinMile / zero-duration
- ✓Set a new baseline and the register repopulates — manual entries survive
See Programme + Key Dates demo →DCMA 14-point assessment with adjustable thresholds and drill-down.
- ✓Native P6 .xer and CSV (MS Project) parsing
- ✓Real defaults: 5 % / 0 % / ≥ 90 % FS / 44d / ≥ 0.95
- ✓Drill-down per check shows the activities responsible
- ✓Critical Path Test reports actual slip-days propagated
See Schedule Health demo →⇄
Schedule
Schedule Comparison
Diagnose what changed between two programmes — every dimension.
- ✓Per-activity variance on plan finish, duration, float, effort and cost
- ✓Predecessor diff — added, removed, type / lag changes
- ✓Excel export with summary + change log sheets
- ✓Compare any two programmes from a project, not just baseline-to-current
See Schedule Comparison demo →Time-slice windows, longest-path tracing, FIDIC entitlement attribution.
- ✓Per-window CPM with longest-path tracing and root-cause walk
- ✓Event correlation tied to Notice Tracker — strong / weak / not related
- ✓Notice time-bar validation under Sub-Clause 20.1 / 20.2
- ✓Sub-Clause 8.4 / 8.5 attribution between EOT entitlement and Contractor's risk
See Delay Analysis demo →AI Generator reads contract + programme — produces risks with owner, reasoning, and response strategy.
- ✓AI Generator: one click reads contract form + Particular Conditions + Contract Data + chosen programme
- ✓Risk Owner assigned by entitlement test — Employer for 4.12 / 1.9 / 8.4 events, Contractor for own-account risks
- ✓Probability + Impact + Response reasoning cited per risk — no hallucinations, no generic catalogue rows
- ✓Multi-register snapshots: baseline-blindsight vs. updated programme; full Excel round-trip with editable 5×5 heat map
See Risk Register demo →∿
Risk
Monte Carlo Simulation
Turn your mapped risk register into a confidence-banded completion forecast.
- ✓P50 / P80 / P90 completion dates from up to 10,000 iterations
- ✓Completion S-curve with P80 / P90 reference lines
- ✓Tornado of the most influential activities and risks
- ✓Pre vs post-mitigation overlay; PERT, triangular, normal or uniform
See Monte Carlo Simulation demo →More tools coming soon
We are building intelligent tools for construction project controls. Designed for the professionals who plan, control, and deliver construction projects.